Camp Nazareth New Cabin Project Days 1-10
Construction progress on new multi-purpose cabin at Camp Nazareth - Days 1-10.
![](http://farm5.static.flickr.com/4414/37124594136_4e4827deb5_b.jpg)
The new cabin project begins with a trailer and a porta-potty together with an excavator and bulldozer.
![](http://farm5.static.flickr.com/4341/37315500945_663a1c52dd_b.jpg)
Prepping the land after the trees had been cut down and removed.
![](http://farm5.static.flickr.com/4356/37124812896_9a2cf62d31_b.jpg)
Flattening the pad
![](http://farm5.static.flickr.com/4432/36477853444_a9b6007255_b.jpg)
A view from the where the back of the new cabin will eventually be.
![](http://farm5.static.flickr.com/4438/37124617656_d6a68fbe6d_b.jpg)
We had to bring in a good amount of good fill to get the site ready for the foundation.
![](http://farm5.static.flickr.com/4387/36501631463_d5f42b69ca_b.jpg)
Beginning the leveling process
![](http://farm5.static.flickr.com/4373/37124790046_276219d959_b.jpg)
The dozer has a small leveling device attached to it to help the operator continue to level the pad.
![](http://farm5.static.flickr.com/4431/37315471215_89d405a588_b.jpg)
Looking from cabins 1 & 2 towards the future cabin.
![](http://farm5.static.flickr.com/4344/36917582960_a3cb408310_b.jpg)
It was determined that these twin towers in the back were too close to where the foundation would be so they were going to have to be removed. But there's a use for them...you'll see!
![](http://farm5.static.flickr.com/4350/36917564290_29a710d8d3_b.jpg)
After one of the trees was removed.
![](http://farm5.static.flickr.com/4341/37124623656_1b70266072_b.jpg)
Beginning to dig for the footers.
![](http://farm5.static.flickr.com/4413/36917557530_7641bc50f6_b.jpg)
Worked moved along quickly.
![](http://farm5.static.flickr.com/4346/36917549300_17ebf6ac61_b.jpg)
Your basic pile of rebar.
![](http://farm5.static.flickr.com/4371/37142253602_c09077dc7d_b.jpg)
Looks like a upside down cockpit for something the Empire used in Star Wars Return of the Jedi.
![](http://farm5.static.flickr.com/4352/37315395225_d81cdb5b5e_b.jpg)
Re-bar before the footers were poured.
![](http://farm5.static.flickr.com/4406/37315296245_9bf2a42b19_b.jpg)
Everything was ready for inspection and to be poured.
![](http://farm5.static.flickr.com/4412/37142226322_e039c6d050_b.jpg)
Pouring the footers.
![](http://farm5.static.flickr.com/4344/37172445821_6ded2a925e_b.jpg)
A look along the northwest wall.
![](http://farm5.static.flickr.com/4429/36501569513_760fc24b78_b.jpg)
Tapping into the electrical was easy. Camp had left itself electric hook-ups from the Cabin Expansion Project.
![](http://farm5.static.flickr.com/4346/36917409980_f86e59b5bb_b.jpg)
The foundation being laid.
![](http://farm5.static.flickr.com/4402/37315365865_6db516f08d_b.jpg)
These guys worked quickly...
![](http://farm5.static.flickr.com/4374/36917479220_b1a35157c9_b.jpg)
...and finished the foundation in 1 day.
![](http://farm5.static.flickr.com/4406/37124704456_b91a37b5bb_b.jpg)
A tired digger and front loader.
![](http://farm5.static.flickr.com/4352/37315317495_a588a935f5_b.jpg)
Conduit for the electric.
![](http://farm5.static.flickr.com/4404/36917469520_6dd68ab17a_b.jpg)
Here's the twin towers cut down. The pieces being used are 55 feet long - they'll be used as part of a bridge on the Dogwood Trail.
![](http://farm5.static.flickr.com/4350/37172370001_bfd21f930a_b.jpg)
Getting the plumbing squared away.
![](http://farm5.static.flickr.com/4373/37124680986_89ae116837_b.jpg)
Job done well...and quickly.
![](http://farm5.static.flickr.com/4415/37315343445_054910ca63_b.jpg)
The cabin will have 2 showers and 2 bathrooms
![](http://farm5.static.flickr.com/4381/37172375171_8b42f19d73_b.jpg)
Wasn't hard to find the water, storm water and septic. The line to the left is the old line that used to supply water to A & B but since the Cabin Expansion project it isn't needed.