Diocesan Photo Gallery
Photo Galleries of the Various Institutions and Ministries of the Diocese
Camp Nazareth New Cabin Project Days 39-56
Camp Nazareth 2017 New Cabin Project.
![](http://farm5.static.flickr.com/4682/24277658757_8f4faa9e5f_b.jpg)
Told you!
![](http://farm5.static.flickr.com/4647/25270777128_d6e50f6005_b.jpg)
Just a door with a classier version of louvers.
![](http://farm5.static.flickr.com/4739/24277389117_270ae3a119_b.jpg)
Still a few things to do but nearly done
![](http://farm5.static.flickr.com/4681/38255098055_de1a89d50f_b.jpg)
There's some equipment still in the structure but not nearly as much as there had been.
![](http://farm5.static.flickr.com/4684/27359394649_76f649d19c_b.jpg)
From the outside...
![](http://farm5.static.flickr.com/4646/38427338404_dfbe558714_b.jpg)
The interior doors were hung and awaited their coats of stain.
![](http://farm5.static.flickr.com/4634/39105954632_b59ea464a7_b.jpg)
The flooring guys are nearly done. They made quick work of the new cabin.
![](http://farm5.static.flickr.com/4633/25270847638_c6f7c8f72c_b.jpg)
Looking toward Cabins A and B and the Staff Lodge off the nice front porch.
![](http://farm5.static.flickr.com/4728/27359437099_59bcc98895_b.jpg)
The flooring guys worked very quickly.
![](http://farm5.static.flickr.com/4734/27359445169_07289444ae_b.jpg)
Getting the floor in the shower area prepped and ready for tile.
![](http://farm5.static.flickr.com/4642/39105986592_63a5f9cedc_b.jpg)
Putting the finishing touches on a few things.
![](http://farm5.static.flickr.com/4737/39105995742_d3d6b3d329_b.jpg)
The interior doors came in and awaited their turn to be hung.
![](http://farm5.static.flickr.com/4590/25270766678_b5d85e9d01_b.jpg)
A nice view through the hallway window.
![](http://farm5.static.flickr.com/4636/39137519761_e449002da1_b.jpg)
The front without the front porch railing just yet.
![](http://farm5.static.flickr.com/4589/38255207015_cd4d440c43_b.jpg)
Site of the future Hot Water Tank.
![](http://farm5.static.flickr.com/4640/24277599947_50b011dc49_b.jpg)
Showers are coming together!
![](http://farm5.static.flickr.com/4588/38255219805_d8df527516_b.jpg)
FRP in the bathrooms
![](http://farm5.static.flickr.com/4690/24277614377_110dae32f9_b.jpg)
Even though their was a lot of stuff in the way, the painters did well doing their work.
![](http://farm5.static.flickr.com/4588/27359512089_79ccdb04c2_b.jpg)
You can see the color verses the white.
![](http://farm5.static.flickr.com/4638/39106080112_b1e2b57777_b.jpg)
Almost like painting in the dark.
![](http://farm5.static.flickr.com/4645/27359518039_51920d9ea4_b.jpg)
Eventually the plastic will come off and we'll be able to see outside!
![](http://farm5.static.flickr.com/4644/38255256805_42df1d8de1_b.jpg)
The equipment won't be their for long.