Camp Nazareth Cabin Expansion Project Days 107-117 (3/26/16)

The Camp Nazareth Cabins are undergoing a major upgrade with this expansion. New bathrooms, showers, a large common room, covered front porches, and climate control (hvac) are just some of the planned upgrades.

The project is scheduled to be completed by April 1, 2016.

Photos show scenes from days 107-117 of construction: Mar. 11, 2016 - Mar. 25, 2016.

View Additional Project Photos
Mar. 11 - Prepping for the facia.
Mar. 16 - Bending equipment for the facia.
Mar. 11 - Got roofs!
Mar. 16 - Drawing...check! Pencil...check! Glasses...check! Mapping out the sidewalks.
Mar. 16 - What we have here is your standard surveying equipment...determining the best spot for the sidewalks.
Mar. 18 - Behind Door #1...shower. Behind Door #2...shower. Behind Door #3...shower. A pattern is developing here. Behind Door #4...new bathroom.
Mar. 18 - Water was brought from a little ways away up to the pump room.
Mar. 18 - The filled in trench from the new well.
Mar. 18 - Sideview of cabins 1 & 2
Mar. 22 -- One of the duplex common rooms. Wow!
Mar. 22 - A view of cabins 4 & 5
Mar. 22 - The slab for the water treatment and pump room which is connected to the Bathhouse
Mar. 22 - Leveling the floor for the water treatment and pump room.
Mar. 22 - What's new in this picture is gutters and downspouts.
Mar. 22 - Grading and leveling when it hasn't rained is much easier