Camp Nazareth Residence Addition Block/Footer & Floor
![](http://farm7.static.flickr.com/6056/6343810051_2df4436b92_b.jpg)
Finishing up the block work.
![](http://farm7.static.flickr.com/6222/6343810657_b3dd6eabd4_b.jpg)
Tarps needed to prevent the ground from caving in from the rain.
![](http://farm7.static.flickr.com/6112/6344559794_dc36c0ea3b_b.jpg)
With the church in the background, a block worker surveys a job well done.
![](http://farm7.static.flickr.com/6093/6344560478_2fca181519_b.jpg)
It was great to see the block work go so well.
![](http://farm7.static.flickr.com/6034/6344561150_58dd9c4771_b.jpg)
Making sure the block work was done right.
![](http://farm7.static.flickr.com/6219/6343813179_7fa89ecfae_b.jpg)
The block work was done in just a few days.
![](http://farm7.static.flickr.com/6108/6343813903_67d0d29ec1_b.jpg)
Say hello to the fellas who did the block and footer work.
![](http://farm7.static.flickr.com/6098/6343814583_ecbfd24129_b.jpg)
Each joist was a step closer to have a floor to walk on.
![](http://farm7.static.flickr.com/6232/6344563882_5c6fe9e4dc_b.jpg)
Inspector Joshua looks over Lee's work.
![](http://farm7.static.flickr.com/6099/6344564474_304cab5151_b.jpg)
Lee getting ready to set a plate on the block.
![](http://farm7.static.flickr.com/6215/6344565044_a30f2d3557_b.jpg)
Another view of the joists being set.
![](http://farm7.static.flickr.com/6235/6344565654_cab3398ddb_b.jpg)
22 ounce hammer + several hundred nails+ sweat = a floor
![](http://farm7.static.flickr.com/6237/6343817649_b0911b648a_b.jpg)
The Church watches over every step of the project.
![](http://farm7.static.flickr.com/6101/6343818231_16b8435f72_b.jpg)
A little bit of hammer & nail work.
![](http://farm7.static.flickr.com/6223/6343818863_cdfea91e13_b.jpg)
The floor begins to take shape.
![](http://farm7.static.flickr.com/6036/6344567948_0b18a12fb6_b.jpg)
Putting in the joists for the floor.