2016 IOCC Memorial Build Week 1 - Day 3 (06/08/16)

On Wednesday June 8, 2016, construction continued on the Fr. Michael Rosco Memorial Habitat for Humanity Build Project.

Posted photos show scenes from the erection of framing for some of the interior walls.

Read today's blog post here:
www.sjhfhmbp.org/#!More-walls-and-sweat/zdvrn/5758ab780cf...

View Additional Photos here: www.acrod.org/multimedia/photos/?collection_id=35102136-7...
Moving a truck load of roof trusses that were dropped in the street
Team effort to move roof trusses
Construction of one of the many interior walls.
Some of the interior walls in place.
End of another day and several of the interior walls are up.
Nailing in a top plate.
A wonderful meal at the center.
Fr Michael Chendorain making some final adjustments.
Top plates almost done
Measuring the hall doorway
Installing the last of the interior walls
Nailing in the top plates
End of day 4 and all wall framing in place and ready for sheathing.
Words of wisdom from the future home owner
Words of wisdom from the future home owner.