Camp Nazareth Residence Addition Basement and Slab
![](http://farm8.static.flickr.com/7167/6600664025_05a0cd4f2c_b.jpg)
Almost done, after four days of struggling with the sturdiest foundation ever built.
![](http://farm8.static.flickr.com/7168/6600664711_97a62d6df4_b.jpg)
Lee watches as the block wall "comes a crumbling down."
![](http://farm8.static.flickr.com/7024/6600665413_dbed915e34_b.jpg)
Even the Bobcat with a jackhammer on it struggled to take down the wall.
![](http://farm8.static.flickr.com/7170/6600666137_6d0db99bcf_b.jpg)
Trying to get through the garage wall and into the basement was like trying to break into Fort Knox.
![](http://farm8.static.flickr.com/7034/6600668849_65f9e8a7b0_b.jpg)
Working on pouring the slab in the basement.
![](http://farm8.static.flickr.com/7034/6600668191_e339d8e73c_b.jpg)
The slab in the basement was poured through the basement window openings.
![](http://farm8.static.flickr.com/7167/6600667505_398f9a0208_b.jpg)
The mixer.
![](http://farm8.static.flickr.com/7174/6600666827_0d316fea0f_b.jpg)
Nice work on the finished slab.
![](http://farm8.static.flickr.com/7155/6600669907_1aa5fa5364_b.jpg)
Basement after the slab was poured and plumbing was being installed.
![](http://farm8.static.flickr.com/7014/6600671271_5737503947_b.jpg)
Stairs to and from the basement.
![](http://farm8.static.flickr.com/7034/6600672591_f595d3061e_b.jpg)
Part of the interior rough framing.
![](http://farm8.static.flickr.com/7033/6600673939_02522df4c2_b.jpg)
Beginning to tie into the existing portion of the residence.