Camp Nazareth Residence Addition Roof
![](http://farm8.static.flickr.com/7160/6600792861_5327d1e5d6_b.jpg)
Getting the titanium paper on the roof to weatherproof it.
![](http://farm8.static.flickr.com/7032/6600791661_58364bd9fd_b.jpg)
Preparing the roof.
![](http://farm8.static.flickr.com/7151/6600790639_586ba3aef8_b.jpg)
Tarps were used to protect the roof until the titanium paper was applied.
![](http://farm8.static.flickr.com/7143/6600789579_fe1a8fddff_b.jpg)
Once applied the titanium paper could have protected the addition throughout the entire winter without the metal shingles.
![](http://farm8.static.flickr.com/7172/6600788541_dcab2677cb_b.jpg)
Almost ready for the shingles to be put on.
![](http://farm8.static.flickr.com/7142/6600793955_426bee220e_b.jpg)
The roofing company was able to re-use the existing metal shingles and so save on cost.
![](http://farm8.static.flickr.com/7175/6600795035_c00dffac5a_b.jpg)
"Down in the valley..." The proper construction of the valleys is an important part of the metal roofing process.
![](http://farm8.static.flickr.com/7024/6600796169_23f2ac78e6_b.jpg)
Front view of the residence addition.
![](http://farm8.static.flickr.com/7148/6600797207_89b530b9e6_b.jpg)
The addition roof matches the lodge and was put on by the same company that had re-done the lodge roof years earlier.
![](http://farm8.static.flickr.com/7169/6600798137_3e6fdf55b0_b.jpg)
It took 4 days to complete the roof.
![](http://farm8.static.flickr.com/7015/6600799197_5a7fa6e036_b.jpg)
Workers putting the finishing touches on the roof.
![](http://farm8.static.flickr.com/7149/6600800221_173ed8aa18_b.jpg)
The siding went on at the same time as the roof.
![](http://farm8.static.flickr.com/7016/6600801267_35df5202bb_b.jpg)
The roof of the addition tied in very nicely with the existing roof.
![](http://farm8.static.flickr.com/7018/6600802379_f89a7a7889_b.jpg)
Nearly done with the roof.